
Rehabilitation of Track Structure on Collingswood Viaduct
To construct improvements to the Collingswood viaduct. These improvements address the following main issues:
- Removal of existing deteriorated grout trenches.
- Replace the existing track fastening system with a modern Direct Fixation Fastening (DFF) System.
- Re-anchoring of the emergency guard rail system.
- Miscellaneous repairs noted in the Preliminary Design Report.