powered by: google

Text Size:   A   A
Port Authority Transportation Company
  • FREEDOM Card
  • What's New
  • E-Notifications
  • Projects
  • Lost & Found
  • Contact Us
  • Home
  • Maps & Stations
    • Overall Route Map
    • Lindenwold
    • Ashland
    • Woodcrest
    • Haddonfield
    • Westmont
    • Collingswood
    • Ferry Avenue
    • Broadway
    • City Hall
    • 8th & Market
    • 9-10 & Locust
    • 12-13 & Locust
    • 15-16 & Locust
  • Schedules & Fares
    • Schedules
    • Travel Alerts & Notices
    • Email Notification Service
    • FREEDOM Fare System
    • Fares
    • Reduced Fare Program
  • Traveling on PATCO
    • First Time Rider
    • Seniors
    • Students
    • Accessibility
    • Service Animals
    • FAQs
    • Bicycles
    • Transit Ambassadors
    • Lost & Found
    • Quiet Car
    • Courtesy Counts
    • Rules & Regulations
    • Photography, Filming & Video Policy
    • Travel Links
    • Alternate Transit
    • Think Green Ride PATCO!
  • News & Media
    • Join Our Mailing List
    • PATCO Press Releases
    • Media
    • Advertising on PATCO
  • Safety & Security
    • Transit Watch
    • What Should I Consider Suspicious?
    • DRPA Police
    • Crime Prevention Tips
    • Safety Tips
    • How Do I?
    • Emergency Procedures
  • About PATCO
    • Projects
    • Studies
    • Board Information
    • Citizens Advisory Committee
    • PATCO Cares
    • Message from General Manager
    • Title VI Programs
    • Americans with Disabilities Act (ADA)
    • Office of Inspector General
    • PATCO History
    • Employment
    • Bids & Contracts
    • DRPA Website
  • Site Map
Projects
  • Additional projects

Elevator Installations

Multimillion dollar project will make all PATCO stations fully accessible

  • Budget: $32 million
  • Design phase: Completed
  • Construction phase: Fall 2017
  • Contractor: A.P. Construction
  • Duration: 48 months
  • Completion date: Fall 2022

Upon completion, all 13 PATCO stations will be fully accessible to individuals with disabilities and those using wheelchairs, strollers and bicycles.

Stations receiving elevators:

  • Haddonfield (Completed)
  • Collingswood (Completed)
  • Westmont (Completed)
  • Ashland (Completed)
  • Camden City Hall (Under Construction)
  • 12/13th & Locust Street (Under Construction)

The project will take place in three phases. The Haddonfield and Collingswood stations will be targeted in the first phase, followed by the Westmont and Ashland stations in the second phase and the Camden City Hall and the 12/13th & Locust Street stations in the third phase.

The four stations targeted in the first and second phases of the project will each receive one elevator, while two elevators will be constructed at the Camden City Hall and the 12/13th & Locust Street stations, one running from street level to the concourse level and a second connecting the concourse to the train platform. Additional concourse extensions, fare gates and work on interior platform stairs and ramps will be required at the Haddonfield, Collingswood, Westmont and Ashland stations.

Construction, made more complex due to the limited size and footprint of the existing stations, will include:

  • Demolition
  • Site and landscape clearing
  • Construction of machine rooms, control rooms and station additions or reconfigurations
  • Infrastructure upgrades
  • Utility relocation
  • Plumbing, mechanical, electrical, structural and fire protection system work
  • Ticket vending machine installation and relocation
  • Removal and installation of ornamental ceilings, paint and tile application
  • Lighting, signage and railing relocation and installation



12/13th & Locust St. Station Rendering



Elevator_Rendering_City Hall Station Rendering



Collingswood Station Rendering



Westmont Station Rendering



Haddonfield Station Rendering



Ashland Station Rendering